首页> 美国政府科技报告 >Periodic Inspections of Cleveland Harbor East Breakwater, Ohio, and Burns Harbor North Breakwater, Indiana.
【24h】

Periodic Inspections of Cleveland Harbor East Breakwater, Ohio, and Burns Harbor North Breakwater, Indiana.

机译:定期检查克利夫兰港东防波堤,俄亥俄州和伯恩斯港北防波堤,印第安纳州。

获取原文

摘要

Monitoring Completed Navigation Projects (MCNP) Program evaluates the structural and functional performance of existing navigation structures. Under Periodic Inspections, aerial photography, ground-truth surveys, walking inspections, photogrammetry, and lidar elevation data are used to periodically assess the structural conditions of selected structures. A database of these structures is being compiled for asset management and other purposes. Cleveland Harbor East Breakwater, OH, has sustained extensive damage since its construction in 1915. The Breakwater has had an extensive repair history, including a major rehabilitation in 1979 80 involving the placement of 2-ton dolosse on the lakeward slope and crest of the easterly 4,400 feet (ft). Some failed and were replaced with 4-ton dolosse. Other repairs took place in 1986, 1989, 1991, and 2001 on the nondolos sections. Burns Harbor North Breakwater, IN, is a 4,640 ft rubble-mound structure constructed in 1969. The Breakwater has required extensive maintenance including the addition of 290 kilotons of stone through 1989. A submerged reef was constructed between 1995 and 1998, 75 ft lakeward of the Breakwater, to reduce wave energy reaching the structure.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号