首页> 美国政府科技报告 >Cost of Unsuitability: Assessment of Trade-offs Between the Cost of Operational Unsuitability and Research, Development, Test and Evaluation (RDT&E) Costs
【24h】

Cost of Unsuitability: Assessment of Trade-offs Between the Cost of Operational Unsuitability and Research, Development, Test and Evaluation (RDT&E) Costs

机译:不适合的成本:评估运营不合适成本与研究,开发,测试和评估(RDT和E)成本之间的权衡

获取原文

摘要

More than one fourth of all major weapon systems that underwent Operational Test and Evaluation from 1984-2006 were evaluated as unsuitable. A frequent and significant contributing factor in these unsuitable evaluations was substandard reliability. When a system is deemed unsuitable due to substandard reliability, it necessarily incurs additional costs to avoid, fix, or accept the consequences of its unsuitability. We estimate such costs for three aircraft systems (F-22, MV-22, and C-17) that were all subject to substandard reliability, but invested to improve it during different programmatic phases. The F-22 and MV-22 programs attempted to fix substandard reliability after being evaluated as unsuitable at Initial Operational Test and Evaluation (IOT&E). The C-17 attempted to avoid an unsuitable evaluation at IOT&E by investing to improve its substandard reliability during the System Development and Demonstration phase. Our results provide insight into the cost- based trade space for addressing unsuitability issues at different programmatic phases. We found that (1) being unsuitable due to substandard reliability is costly; (2) investments to improve reliability exhibit strong returns; and (3) earlier investment in reliability yields higher returns.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号