首页> 美国政府科技报告 >USAF Enlisted Air Traffic Controller Selection: Examination of the Predictive Validity of the FAA Air Traffic Selection and Training Battery versus Training Performance; Final rept
【24h】

USAF Enlisted Air Traffic Controller Selection: Examination of the Predictive Validity of the FAA Air Traffic Selection and Training Battery versus Training Performance; Final rept

机译:美国空军入伍空中交通管制员选择:审查美国联邦航空局空中交通选择和培训电池与培训绩效的预测有效性;最终的评论

获取原文

摘要

Over the past decade, the U.S. military has conducted several studies to evaluate determinants of enlisted air traffic controller (ATC) performance. Research has focused on validation of the Armed Services Vocational Aptitude Battery (ASVAB) and has shown it to be a good predictor of training performance. Despite these efforts, enlisted ATC training and post- training attrition is higher than desirable, prompting interest in alternate selection methods to augment current procedures. The current study examined the utility of the FAA Air Traffic Selection and Training (AT-SAT) battery for incrementing the predictiveness of the ASVAB versus several enlisted ATC training criteria. Subjects were 448 USAF enlisted ATC students who were administered the ASVAB and FAA AT-SAT subtests and subsequently graduated or were eliminated from apprentice-level training. Training criteria were a dichotomous graduation/elimination training score, average ATC fundamentals course score, and FAA certified tower operator test score. Results confirmed the predictive validity of the ASVAB and showed that one of the AT-SAT subtests resembling a low-fidelity ATC work sample significantly improved prediction of training performance beyond the ASVAB alone. The results suggest that training attrition could be reduced by raising the current ASVAB minimum qualifying score. However, this approach may make it difficult to identify sufficient numbers of trainees and lead to adverse impact. Although the AT-SAT ATC work sample subtest showed incremental validity to the ASVAB, its length (95 minutes) may be problematic in operational testing. Recommendations are made for additional studies to address issues affecting operational implementation.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号