首页> 美国政府科技报告 >Inspection of Improvements to the Khowst City Electrical Power System: Safety and Sustainability Issues Were not Adequately Addressed
【24h】

Inspection of Improvements to the Khowst City Electrical Power System: Safety and Sustainability Issues Were not Adequately Addressed

机译:对Khowst市电力系统改进的检查:安全性和可持续性问题未得到充分解决

获取原文

摘要

This report provides observations and findings of the inspection that SIGAR conducted on May 15-17, 2009 which examined aspects of the project initiated by the Khowst Provincial Reconstruction Team (PRT) to improve the Khowst City Electrical Power System. The inspection assessed the design and construction work performed as part of that project in 2008 which was funded with $1.565 million from the Commander's Emergency Response Program (CERP). While this project improved and updated the electrical power service to better meet Khowst City's residential and business needs, our inspectors found that: 1) one of the two contracts for improvements to the Khowst City Power System did not include a number of key requirements; 2) the contractor who was awarded that contract did not meet several important contract requirements; 3) U.S. government quality assurance was inadequate; and 4) the Government of the Islamic Republic of Afghanistan (GIRoA) may lack the capacity to operate and perform maintenance of the project in a manner that sustains the U.S. government's investment of almost $1.6 million.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号