首页> 美国政府科技报告 >Environmental Assessment for the Outgrant of Real Estate and Construction of JP-8 Pipeline and Receiving Facility at Travis Air Force Base.
【24h】

Environmental Assessment for the Outgrant of Real Estate and Construction of JP-8 Pipeline and Receiving Facility at Travis Air Force Base.

机译:特拉维斯空军基地房地产开发和Jp-8管道和接收设施建设的环境评估。

获取原文

摘要

The existing JP-8 distribution and dispensation infrastructure at Travis AFB is nearing capacity and is presently served by approximately 7 miles of USAF-owned and operated off-base pipeline. These identified security and capacity shortfalls potentially limit the ability to maintain and operate base-assigned and other aircraft at Travis AFB. Each proposed alternative would involve the outgrant of real estate on Travis AFB to SFPP, LP (SFPP) upon which SFPP would install, own, operate, and maintain an approximately 1.9-mile JP-8 pipeline, receiving facility, and junction station. Pipeline installation would occur by conventional trenching and additional construction methods specific to each alternative. Under Alternative 1 the Proposed Action approximately 1.1 miles of the pipeline would be installed by horizontal directional drilling. Under Alternative 2, five pipeline segments totaling approximately 0.2 mile would be installed by slick-bore. Under Alternative 3, approximately 1.2 miles of the pipeline would be installed aboveground, and an access road would be constructed adjacent to the aboveground pipeline segment. Under the No-Action Alternative, existing JP-8 distribution and dispensation infrastructure at Travis AFB and identified security and capacity shortfalls would remain unchanged.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号