首页> 美国政府科技报告 >Lay Hold. Heave. Building Speed: Excitement and Satisfaction in Pushing the BGE Flywheel.
【24h】

Lay Hold. Heave. Building Speed: Excitement and Satisfaction in Pushing the BGE Flywheel.

机译:搁置。升沉。建筑速度:推动BGE飞轮的兴奋和满足感。

获取原文

摘要

Seeking to reverse quantifiable degradation to engineer leader technical and tactical competency, the Fort Leonard Wood portion of ENFORCE 2008 built on the foundation of six Engineer Leader Technical Competency (ELTC) work groups: (1) Future Roles, Missions, Delivery Methods, (2) Accessions, (3) Training and Education, (4) Employment, (5) Retention, and (6) Strategic Communications. Less than 60 days later, the result was a Chief of Engineers- approved Building Great Engineers Campaign Plan with nearly 40 initiatives. For those with Army Knowledge Online (AKO) access, that plan can be read on the Engineer School Knowledge Network (ESKN). Seven months later (as of this 1 March writing), what has become of the efforts of those who have remained engaged and put shoulder to the flywheel. Too often good ideas languish and die from lack of follow-up and effort. Did we really begin doing what we said we were going to do. Is the flywheel turning. The intent of this article is to inform the Engineer Regiment on the current status of many BGE actions initiated by the plan and the way ahead in increasing engineer leader technical and tactical competency for full spectrum operations in an era of persistent conflict.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号