Applying Risk Management to Reduce The Overall Time In Lay-Up While Increasing the Cost Effectiveness of a Nimitz (CVN 68) Class Aircraft Carrier in Dry Dock During the Execution Phase of a Refueling and Complex Overhaul

机译:在加油和复杂大修的执行阶段,应用风险管理减少铺设的总时间,同时提高干船坞中尼米兹(CVN 68)级航空母舰的成本效益

获取原文

摘要

The Refueling and Complex Overhaul (RCOH) of an aircraft carrier is one of the most important milestones in a carrier's lifecycle. An RCOH supports the future modernization efforts that will sustain the carrier and extend its nuclear fuel lifetime an additional twenty-five years. To date only two Nimitz class carrier overhauls have been completed, with a third in progress. Although these RCOHs were viewed as overall successes, they were unsuccessful from a risk management perspective because ultimately resulted in consecutive delivery delay and increased cost. This research assessed three (3) possible risk mitigation strategies for achieving cost and time effectiveness of a Nimitz class nuclear powered aircraft carrier (CVN) in dry-dock during the execution phase of an RCOH. The strategies evaluated were (1) to maintain the current RCOH process, (2) reduce and defer non-nuclear maintenance coupled with schedule compression, and (3) increase the efficiency of power usage of carriers with the intent of eliminating the need for refuelings. The results of this research indicate that eliminating a carrier's RCOH increases its overall cost and time effectiveness. It also reveals that a 33-year carrier lifecycle, as opposed to a 50-year lifecycle, increases the ship's operational availability and modernization capability.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号