首页> 美国政府科技报告 >Geophysics for Military Construction Projects
【24h】

Geophysics for Military Construction Projects

机译:军事建设项目的地球物理学

获取原文

摘要

Buried infrastructure at Military Construction (MILCON) project sites can cause large project cost overruns if not located and removed prior to the start of the project. This project demonstrated how geophysical survey tools can be utilized to locate buried materials. Utility piping and 55-gallon drums were buried in three soil types at various depths and standard off-the- shelf geophysical equipment was used to image the materials and quantify the benefits and pitfalls of each method. The techniques and examples from this demonstration can be used as a guide by personnel involved with MILCON project scoping when historic buried utilities or debris of unknown are present or suspected.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号