首页> 美国政府科技报告 >International Acquisition Programs: Variables Beyond Cost, Schedule and Performance.
【24h】

International Acquisition Programs: Variables Beyond Cost, Schedule and Performance.

机译:国际采购计划:超出成本,进度和绩效的变量。

获取原文

摘要

Due to rising fighter aircraft acquisition costs and constrained defense budgets, the Department of Defense is looking for effective and efficient acquisition practices that will deliver the necessary capability to the armed forces within the fiscal constraints. One acquisition practice directed to combat the rising cost is international acquisition programs. Cost, schedule, and performance are the traditional variables used when measuring program success and managing acquisition program risk. However, measuring international acquisition programs with only the traditional variables of cost, schedule and performance would be an incomplete analysis. Leaders of international acquisition programs must consider the additional variables of international economic impact, industrial base, technology transfer, and international relations. These variables should be considered when measuring risk throughout the life cycle of the program and a consideration when evaluating the program performance.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号