Enhancing the Enhanced Scenario-Based Method of Cost-Risk Analysis

机译:加强基于方案的增强成本风险分析方法

获取原文

摘要

The current s-curve method of cost-risk analysis for major DoN acquisitions projects does not accurately estimate actual cost when the program reaches full-rate production. Another, sometimes more effective method of measuring cost risk, is the enhanced scenario-based method (eSBM) of risk analysis. The reason that cost estimations based on Milestone B costs are inaccurate is that little, if any, real information about the project is known at that point in the project. eSBM allows managers a less statistically tasking method of determining cost risk for a project while still maintaining the requirements of the Weapons System Acquisitions Reform Act (WSARA) of 2009. In measuring the usefulness of eSBM, the key factors should focus on the acquisition strategy being used for the project and the time frame from Milestone B to later milestones. I hypothesized that different acquisition strategies will yield different levels of success in estimating cost risk for eSBM.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号