首页> 美国政府科技报告 >Probability of Flood-Induced Overtopping of Barriers in Watershed- Reservoir-Dam Systems
【24h】

Probability of Flood-Induced Overtopping of Barriers in Watershed- Reservoir-Dam Systems

机译:流域 - 水库 - 坝体系统中洪水引起的河道超越障碍概率

获取原文

摘要

An engineering methodology is developed to build hazard curves to evaluate the probability of flood-induced overtopping of barriers in watershed- reservoir-dam systems. The probable maximum precipitation in the watershed under consideration and its distribution in time during the acting storm is estimated. Considering the effects of the local geology, soil, topography, and land use, a random representation of the storm hourly rain is translated into effective runoff, including losses due to evaporation, interception, and surface retention. The uncertainty in the hydrological characteristics of the drainage basin is captured by a random time to concentration. Random hourly unit graphs are constructed analytically for a convex watershed and convoluted with the storm time-history to result in the random hydrograph for the inflow flood into the reservoir of the dam system. Flood routing through the reservoir is then computed with or without noise in the model. The deterministic path leads to a hydrograph for the water level at the barrier upstream face. The stochastic path evaluates through simulation the probability density function of variates (at discrete times) of the nonstationary random process of this pool level. The characterization of the reservoir-pool maxima allows the estimation of the probability of barrier overtopping.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号