首页> 美国政府科技报告 >Air Force Guide for Effective Meeting Management
【24h】

Air Force Guide for Effective Meeting Management

机译:空军有效会议管理指南

获取原文

摘要

The C-130 is a tactical airlifter and has been in steady use for decades in austere deployed locations. The inspection program to ensure its sustainment has faced increasing workload requirements due to structural issues related to heavy use and aging materials. The most in-depth inspection is the Programmed Depot Maintenance (PDM) inspection and is accomplished at two Air Logistics Centers (ALCs). In recent years, both centers have experienced increased maintenance time and decreased on-time production rates, with Due Date Performance (DDP) rates as low as 30%. This negatively impacts aircraft availability and mission capability. Another challenge facing the ALCs is the ongoing transition to High Velocity Maintenance (HVM), which is intended to improve aircraft availability to meet mission requirements. This study utilizes a simulation model to assess the impact of adding dock spaces and the impact of prioritizing one aircraft variant over other variants. The model represents the expectation for the entire PDM inspection process based on technical data inspection requirements for the C-130 fleet. Data was generated using expected (scheduled) flow times for major sub-processes from induction into the inspection process through the functional test flight and the return to home station. Simulation results indicate several problems with the current production strategies, including the negative impact of prioritization on the overall due date performance for all C-130 variants.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号