首页> 美国政府科技报告 >Complex 576A (65-1), Launch Complex and Missile Assembly Building, Systems Integration, Acceptance Testing and Test Procedure Requirements. Engineering Schedule D/IOC 8.0.2 and 8.0.3.
【24h】

Complex 576A (65-1), Launch Complex and Missile Assembly Building, Systems Integration, Acceptance Testing and Test Procedure Requirements. Engineering Schedule D/IOC 8.0.2 and 8.0.3.

机译:复杂576a(65-1),发射复杂和导弹装配建筑,系统集成,验收测试和测试程序要求。工程计划D / IOC 8.0.2和8.0.3。

获取原文

摘要

The enclosures supersede all previous schedules and are the official engineering schedule for Integration Testing of GSE and Facility Equipment installation at the Launch Complex and the Missile Assembly Building of 576A (65-1). The schedules reflected are based upon the weekly status report per integrated test plan. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号