SIX QUARTERLY PROGRESS REPORT PRODUCTION ENGINEERING MEASURE FOR THE MANUFACTURE OF DEFLECTION DEVICES

机译:制造偏转装置的六分之一进展报告生产工程测量

获取原文

摘要

This is the Sixth Quarterly Report describing the progress of the USAEMA contract, "Production Engineering Measure for the Manu-facture of Deflectron Devices", for the period ending November. 14,1963. The major portion of this work period was devoted to the preparation of engineering samples and further refinement of the evaporation technique. Evaporation equipment has been completed and put into operation.nAll parts necessary for the completion of the program are either on hand or ordered to be supplied by approved vendors as required. Test and performance characteristics for the three models .of the Deflectron are being finalized.

著录项

  • 作者

    W. J. Noroski;

  • 作者单位
  • 年度 1963
  • 页码 1-44
  • 总页数 44
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词