首页> 美国政府科技报告 >Hydraulic Downpull Computations for Glendo Dam Fixed-Wheel Gate, Missouri River Basin Project, Wyoming
【24h】

Hydraulic Downpull Computations for Glendo Dam Fixed-Wheel Gate, Missouri River Basin Project, Wyoming

机译:怀俄明州密苏里河流域Glendo大坝固定轮闸门的液压低压船计算

获取原文

摘要

The hydraulic downpull forces that will be caused by 2-minute closures of the 16.5- by 21.0 foot Glendo Dam outlet works fixed-wheel gate were computed. Previous model studies (Hydraulics Laboratory Report No. Hyd-421, February 8, 1957) evaluated the hydraulic downpull for a stable condition of flow with the gate stationary at various openings. The present computation showed the added downpull caused by water trapped in the shaft above the gate during rapid closures to be about 4,500 pounds for gate openings larger than 3 feet. No additional downpull occurred at openings smaller than 3 feet. The maximum downpull of 40,000 pounds that occurs at 0.25 foot gate opening remains the maximum and unchanged. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号