首页> 美国政府科技报告 >Initial Production Test of the AN/ARN-83 Automatic Direction Finding Set.
【24h】

Initial Production Test of the AN/ARN-83 Automatic Direction Finding Set.

机译:aN / aRN-83自动测向装置的初始生产测试。

获取原文

摘要

The USAAVNTBD conducted the Initial Production Test of the AN/ARN-83 Automatic Direction Finding Set in the vicinity of Fort Rucker, Alabama, from 3 January to 23 February 1966. The ADF's were installed in a UH-1D Helicopter and a U-8D Airplane and were operated in flight for 54 hours during the tests. The general concept of this test was to verify adequacy and quality of the AN/ARN-83 by performing the same operational and flight tests on the AN/ARN-83 as those conducted on the off-the-shelf ADF. Additional tests were conducted to determine whether the deficiencies and shortcomings of the off-the-shelf equipment had been corrected. The installation characteristics were adequate and were the same as those of the previously-tested off-the-shelf equipment. The inflight performance of the AN/ARN-83 was adequate and comparable to that of the previously-tested off-the-shelf equipment.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号