首页> 美国政府科技报告 >Product Improvement Test of UH-1B Tail-Boom Fitting.
【24h】

Product Improvement Test of UH-1B Tail-Boom Fitting.

机译:UH-1B尾臂配件产品改进试验。

获取原文

摘要

Numerous cracking failures of the original production UH-1B upper-left-hand tail-boom attaching fittings occurred in the field when the helicopters were operated at high gross weights. The fittings cracked approximately 18 inches aft of the tail boom bulkhead. To correct this problem, a stronger fitting was designed and incorporated in the UH-1B fleet. In September 1964, one of the modified fittings cracked after 553 hours of operation at high takeoff gross weights. The crack was two inches aft of the tail-boom bulkhead and extended through the first rivet hole. Subsequently, several similar failures were reported to have occurred in the Republic of Vietnam in UH-1B Helicopters after approximately 500 hours of operation. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号