首页> 美国政府科技报告 >A Rapid Tactical Mine-Planting System: How Force Level Affects Lever-Throwing Time
【24h】

A Rapid Tactical Mine-Planting System: How Force Level Affects Lever-Throwing Time

机译:快速战术矿井种植系统:力水平如何影响杠杆投掷时间

获取原文

摘要

The study investigated how well manpower normally available in the field could operate the control levers of a rapid tactical mine-planting system. The subjects, who were selected to represent a normal range of arm strength, operated a control lever at force levels of 60, 80, and 100 pounds while standing on a mock-up of the mine-planter's control lever platform. The subjects were able to complete the lever push-pull cycle within a two-second time limit at force levels of 60 and 80 pounds. When the force was increased to 100 pounds, they took 3 1/2 seconds to complete the cycle. The time to complete a cycle at 100 pounds grew longer as the one-hour test period continued, but there was no such decrement at 60 and 80 pounds. Arm strength in the seated position, as measured by a push-pull gauge, did not reliably predict performance at the lever-throwing task. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号