首页> 美国政府科技报告 >Spillway and Outlet Works, Shelbyville Dam, Kaskaskia River, Illinois. Hydraulic Model Investigation
【24h】

Spillway and Outlet Works, Shelbyville Dam, Kaskaskia River, Illinois. Hydraulic Model Investigation

机译:溢洪道和出口工程,谢尔比维尔水坝,Kaskaskia河,伊利诺伊州。水力模型研究

获取原文

摘要

Tests were conducted on a 1:40-scale model reproducing the spillway for Shelbyville Dam, a combination concrete and earth structure rising 108 ft above the bed of the Kaskaskia River. The spillway consists of an ogee crest controlled by three tainter gates 45.33 ft wide and 36.92 ft high; a 156-ft-wide, 206-ft-long chute sloped 1 on 4; and a conventional hydraulic jump type stilling basin. The design flood, 162,500 cfs, will be passed at pool elevation 638.2 by combined operation: 157,500 cfs over the spillway and 5000 cfs through two 11-ft-high by 5.5-ft-wide sluices through the spillway section beneath the piers. Flow conditions in the approach, discharge characteristics of the spillway, hydrostatic pressures on the ogee weir crest, performance of the conventional stilling basin, and the height of the training walls were investigated. The limits of two exit channel protection plans involving the use of various sizes and gradations of stone and concrete paving were developed with and without berms behind the training walls. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号