首页> 美国政府科技报告 >Long Range Spoil Disposal Study. Part II. Substudy 1. Short Range Solution.
【24h】

Long Range Spoil Disposal Study. Part II. Substudy 1. Short Range Solution.

机译:远程弃土处置研究。第二部分。子研究1.短程解决方案。

获取原文

摘要

The goal of this study is to locate and obtain, either by fee or easement acquisition, disposal areas which are within economic pumping distance of the dredging requirement. This goal, however, has its limiting factors. Vast land areas along the Delaware River have already been consumed with dredged fill. Marsh and low lands have been filled; many of those remaining have been designated fish and wildlife or water resource areas. Landowners have been reluctant to enter into long term spoil disposal easements where the filling of their land does not result in land enhancement. Proposed fee acquisition of potential disposal areas has met with intense landowner opposition and opposition from local, county and state officials. The urban Greater Delaware Valley is rapidly expanding and potential disposal areas are being consumed by industrial development. Pressures are also being exerted on the Government for relinquishment of present disposal area holdings so that the real estate may be developed industrially and local tax revenue may become available. The only large acreage readily discernible for development into disposal areas is in the Delaware Bay regions which is 25 to 50 miles below the repetitive shoaling areas. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号