首页> 美国政府科技报告 >An Aircraft Rework Cost-Benefit Model
【24h】

An Aircraft Rework Cost-Benefit Model

机译:飞机返工成本 - 效益模型

获取原文

摘要

The paper describes the main objectives of the work in Phase II of the Aircraft Pipeline Study, which were: Develop a model for determining the minimal-cost combination of aircraft and repair resources (spares, equipment, and labor) to achieve a given operational level of aircraft. Compare the solution obtained in applying the model with the then existing allocation of resources at North Island for the F-4 aircraft. Determine how to move from the then existing allocation of resources to the optimal allocation. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号