首页> 美国政府科技报告 >Contract End Item Detail Specification (Prime Equipment). Part I. Performance/Design and Qualification Requirements. Test Position, Purge, Fill, and Leak
【24h】

Contract End Item Detail Specification (Prime Equipment). Part I. Performance/Design and Qualification Requirements. Test Position, Purge, Fill, and Leak

机译:合同结束项目详细规范(主要设备)。第一部分。业绩/设计和资格要求。测试位置,吹扫,填充和泄漏

获取原文

摘要

The specification established the requirements for performance, design, test, and qualification of one model of equipment, identified as purge, fill, and leak test position. This CEI provides for depot level testing of the MAVERICK guidance units. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号