首页> 美国政府科技报告 >“PRODUCTION ENGINEERING MEASURE FOR HIGH RANGE GEIGER MUELLER TUBE.” “SECOND QUARTERLY REPORT COVERING THE PERIOD FROM SEPTEMBER 1972 TO NOVEMBER 1972”
【24h】

“PRODUCTION ENGINEERING MEASURE FOR HIGH RANGE GEIGER MUELLER TUBE.” “SECOND QUARTERLY REPORT COVERING THE PERIOD FROM SEPTEMBER 1972 TO NOVEMBER 1972”

机译:“高范围转鼓管的生产工程措施。”“1972年9月至1972年11月期间的第二季度报告”

获取原文

摘要

An investigation of the proper techniques employed to provide stable, predictable performance, G-M tubes for use as the high range detector of the AN/VDR-1 is discussed. The techniques include special cathode and anode surface treatment to prevent secondary emissions and resultant spurious counts (instability) and up-dated outgassing and filling procedures to improve gas stability and reduce absorption thereby improving voltage stability. In the time period of this report a second set of engineering test samples was fabricated and filled to a starting voltage range of 430 plus or minus 10 volts. Initial tests data indicates a trend toward achieving the required critical parameter of starting voltage stability.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号