首页> 美国政府科技报告 >Spillway for Oakley Dam Sangamon River, Illinois. Appendix A: Type 2 (Revised) Spillway; Hydraulic Model Investigation
【24h】

Spillway for Oakley Dam Sangamon River, Illinois. Appendix A: Type 2 (Revised) Spillway; Hydraulic Model Investigation

机译:奥克利水坝sangamon河,伊利诺伊的溢洪道。附录a:2型(修订)溢洪道;水力模型研究

获取原文

摘要

A description of the proposed Oakley Dam is contained in Part 1 of the main report, which reported results of tests made on the spillway of original design and to which this is an a appendix. The tests reported herein were considered desirable to verify the adequacy of the spillway after after changes were made in the original design. The general purpose of the model tests was to determine what effect the 7-ft reduction in spillway crest (from el 628 to 621) would have on discharge characteristics, stilling basin performance, and riprap protection. To accomplish the purpose, the revised spillway was constructed to a scale of 1:60 and installed in the existing general model. Details of the model are shown.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号