首页> 美国政府科技报告 >Training Plan for the Preliminary Test and Evaluation Detachment for LAMPS MK III (Light Airborne Multi-Purpose System).
【24h】

Training Plan for the Preliminary Test and Evaluation Detachment for LAMPS MK III (Light Airborne Multi-Purpose System).

机译:Lamps mK III(轻型机载多用途系统)初步测试和评估支队培训计划。

获取原文

摘要

The training plan is for the specific purpose of developing the skills required for the development effort and does not affect the required Navy Training Plan for new systems. To accomplish the objectives of the preliminary operational test and evaluation of the LAMPS MK III system, skilled personnel must be provided to operate the equipments and to maintain them at the organizational level. As this is an all new system, the required personnel are not available and therefore must be trained by the developing activity, Naval Air Development Center, Warminster, PA. As additional information becomes available the content of this plan will expand.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号