首页> 美国政府科技报告 >A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering.
【24h】

A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering.

机译:一种无需延期交货的多工具,多产品生产调度问题的网络方法。

获取原文

摘要

A multi-product, multi-facility production scheduling problem is considered over a finite planning horizon. The horizon consists of discrete production periods during each of which at most one product can be assigned to each facility. Product demand rates are assumed to be constant over a period but not necessarily identical in all periods. All demands must be met without allowing backorders. The problem objective is to determine on assignment of products to facilities over the horizon which minimizes the sum of production and inventory carrying charges. The problem is formulated as a network flow problem for which efficient solution procedures are known. However, for an important special case a single pass algorithm is given which is more efficient than the standard flow algorithms. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号