Enhancing the Enhanced Scenario-Based Method of Cost Risk Analysis

机译:加强基于场景的增强成本风险分析方法

获取原文

摘要

The current S-Curve method of cost risk analysis for major Department of the Navy (DON) acquisition projects does not accurately estimate actual cost when the program reaches Full Rate Production. Another sometimes more effective method of measuring cost risk is by using the enhanced scenario- based method (eSBM) of risk analysis. The reason that cost estimations from the milestone B costs are inaccurate is that very little, if any, real information about the project is known. eSBM allows managers a less statistically tasking method of determining cost risk for a project while still maintaining the requirements of the Weapons System Acquisitions Reform Act. The key factors in measuring the usefulness of eSBM should be focused on the acquisition strategy being used for the project and the time frame from Milestone B to later Milestones. I presume that different acquisition strategies will yield different levels of success in estimating cost risk for eSBM.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号