首页> 美国政府科技报告 >Construction/Engineer Equipment Maintenance Study (CEEMS). Volume I. Analysis of Construction/Engineer Equipment Maintenance.
【24h】

Construction/Engineer Equipment Maintenance Study (CEEMS). Volume I. Analysis of Construction/Engineer Equipment Maintenance.

机译:建筑/工程师设备维护研究(CEEms)。第一卷施工/工程设备维修分析。

获取原文

摘要

A definitive study plan,distributed to the Assistant Secretaries (Installations and Logistics) of the Army,Navy and Air Force,and to the Director of the Defense Supply Agency,by an ASD(I and L) memorandum dated 9December 1971delineated the following major study objectives:evaluate the current systems for performing major maintenance/rebuild of construction/engineer equipment,and develop recommendations for improvements where required;analyze alternate policies and systems for improving the accomplishment of the maintenance/rebuild of construction/engineer equipment,and determine their feasibility in terms of responsiveness to operational requirements and costs;determine the potential for consolidating construction/engineer equipment major maintenance functions and/or facilities within the DoD,and evaluate the feasibility and practicality of adopting such action(s). This two volume Report documents the findings from Service and Agency briefing,extensive on-site research at a wide variety of activities,and a comprehensive data call and presents the analyses,conclusions,and recommendations of the study.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号