首页> 美国政府科技报告 >Monitoring of the Fort Knox Industrialized BOQ Project--Design and Construction Phases.
【24h】

Monitoring of the Fort Knox Industrialized BOQ Project--Design and Construction Phases.

机译:监测Fort Knox工业化BOQ项目 - 设计和建造阶段。

获取原文

摘要

This report presents results of the monitorship of the construction and design of a demonstration project of industrialized building applied to Department of the Army construction requirements. The project was a 250-man bachelor officers' quarters (BOQ) at Fort Knox, KY, constructed by FCE-Dillon, Akron, OH, using their system of precast concrete panels and three-dimensional kitchen/bath modules. The experiences in design and production, one-step procurement, construction, and contract administration at Fort Knox are analyzed, and the cost per man housed is compared for BOQs in the FY 73 MCA program. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号