首页> 美国政府科技报告 >ARMCOM Red Team Role in The Single Integrated Development Test Cycle.
【24h】

ARMCOM Red Team Role in The Single Integrated Development Test Cycle.

机译:aRmCOm Red Team在单一集成开发测试周期中的作用。

获取原文

摘要

As part of the new Single Integrated Development Test Cycle Policy, TECOM in coordination with each MSC's Red Team is responsible for evaluation of Development Testing for all systems that AMSAA does not evaluate. This report defines the scope and manpower requirements of the ARMCOM Systems Analysis Directorate in support of the Test Design and Evaluation effort. Twenty-five dedicated professional personnel are required in the Systems Analysis Directorate for the Test Design and Evaluation on a full time basis. These personnel exclude those now serving to fulfill the existing mission requirements of the Directorate. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号