首页> 美国政府科技报告 >Rock Core Tests,Proposed Duplicate Lock-Phase II, Starved Rock Lock and Dam,Illinois River,Illinois.
【24h】

Rock Core Tests,Proposed Duplicate Lock-Phase II, Starved Rock Lock and Dam,Illinois River,Illinois.

机译:岩石核心测试,建议重复锁定阶段II,饥饿岩石锁和水坝,伊利诺伊河,伊利诺伊州。

获取原文

摘要

A rock core testing program was conducted for the U.S. Army Engineer District, Chicago, as part of a continuing foundation investigative program. After reviewing available reports and current drilling activity, a testing program was recommended and subsequently carried out. A sufficient number of laboratory tests were conducted on representative bedrock samples and an analysis of these tests was made. Limited field work was conducted in order to obtain information about orientations of discontinuities. Laboratory tests consisted of index property tests (including unit weights, specific gravity of solids, moisture content, porosity, and compressional wave velocity), unconfined compression, triaxial, tensile, and direct shear tests. Direct shear tests were conducted on intact core, precut surfaces, natural joints, and on thin shale beds contained in dolomite. A petrographic examination was conducted on selected samples to ascertain nomenclature and mineral content.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号