首页> 美国政府科技报告 >Phase II of Feasibility Study of Initial Aircraft Propulsion Subsystem Integration Cost Model.
【24h】

Phase II of Feasibility Study of Initial Aircraft Propulsion Subsystem Integration Cost Model.

机译:初始飞机推进子系统集成成本模型可行性研究的第二阶段。

获取原文

摘要

This report describes two methods of estimating the production costs of jet engines not yet built: (1) By building up the costs of the 'cost driving' parts in a traditional Industrial Engineering fashion and (2) By using regression techniques to estimate either entire engine costs (RAND approach) or parts of engines. The report concludes that both methods are feasible though the former has a greater theoretical accuracy. Potential problems of accounting for changes in performance and schedule may well give the second method the edge in practical application on the bases of cost, speed and speed of implementation. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号