首页> 美国政府科技报告 >Cost Prediction Models for Bringing Selected Air Force Logistics Command Facilities into Compliance with the Occupational Safety and Health Administration Standards.
【24h】

Cost Prediction Models for Bringing Selected Air Force Logistics Command Facilities into Compliance with the Occupational Safety and Health Administration Standards.

机译:使选定的空军后勤指挥设施符合职业安全和健康管理标准的成本预测模型。

获取原文

摘要

The purpose of the study was to ascertain if groupings of Air Force buildings, having the same or similar characteristics (as described in real property records) could be correlated into a mathematical model that would predict the costs necessary to bring buildings into compliance with standards as set by the Occupational Safety and Health Administration. Building characteristics from Air Force real property records (such as floor space, age, and function) were sorted and regressed against estimated costs obtained from an actual MAJCOM survey. The model shows that a correlation can be made between building characteristics and actual survey estimated OSHA retrofit costs. Using similar models, budget estimates for renovation could be calculated for buildings with same or similar characteristics. Recommendations for future surveys are included.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号