首页> 美国政府科技报告 >Cost Effectiveness Program Plan for Joint Tactical Communications, Volume III. Life Cycle Costing. Appendix E. Transportation Cost of Spares and Repair Parts.
【24h】

Cost Effectiveness Program Plan for Joint Tactical Communications, Volume III. Life Cycle Costing. Appendix E. Transportation Cost of Spares and Repair Parts.

机译:联合战术通信的成本效益计划计划,第三卷。生命周期成本核算。附录E.备件和维修零件的运输成本。

获取原文

摘要

The purpose of the appendix is to present an equation for transportation costs which is sensitive to the weight of the item, the distance traveled and the postulated logistic support concept. The equation is obtained by mathematically combining two models (a) the transportation paths that the spares and failed/repaired items traverse and (b) the probabilities or percentages associated with each of four possible transportation paths. This cost element is concerned only with the transportation of spares, repair parts and failed/repaired items during the operation and support phase of the life cycle of the TRI-TAC systems.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号