首页> 美国政府科技报告 >Decision Risk Analysis of Direct Digital Control TNT Lines.
【24h】

Decision Risk Analysis of Direct Digital Control TNT Lines.

机译:直接数字控制TNT线路的决策风险分析。

获取原文

摘要

As part of the Army's Modernization Program, Direct Digital Control (DDC) TNT production facilities were constructed at two Army Ammunition Plants (AAPs). The modernization program consists of two phases: Phase I was the construction of one DDC line at Volunteer AAP; Phase 2 was the construction of three DDC lines at Volunteer AAP and three at Joliet AAP. Volunteer is currently producing on their Phase 1 DDC line. The construction of the Phase 2 TNT lines was based on the same design specifications; however, since each plant had a different construction contractor, there are subtle design differences between plants. Concern over these differences led the Director of the Procurement and Production Directorate, HQ, ARMCOM, Rock Island, IL, to request a decision risk analysis to assess the risks associated with mobilization start-up of DDC TNT lines at Joliet and Volunteer AAPs with and without prior prove-out.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号