首页> 美国政府科技报告 >Changes Are Needed to the Army Contract with Sikorsky to Use Existing DoD Inventory and Control Costs at the Corpus Christi Army Depot
【24h】

Changes Are Needed to the Army Contract with Sikorsky to Use Existing DoD Inventory and Control Costs at the Corpus Christi Army Depot

机译:需要改变与西科斯基签订的军队合同,以便在科珀斯克里斯蒂陆军基地使用现有的国防部库存和控制成本

获取原文

摘要

We evaluated the Army Aviation and Missile Life Cycle Management Command (AMCOM) material purchases from Sikorsky Aircraft Corporation (Sikorsky) supporting the Corpus Christi Army Depot (CCAD) to determine whether the partnership agreement effectively minimized the cost of direct materials to the depot. AMCOM entered into the partnership to address parts availability problems and improve readiness. This report addresses excess DoD inventory, a metric for reducing material costs, and splitting requirements. AMCOM did not effectively use DoD inventory before procuring the same items from Sikorsky because AMCOM did not have adequate procedures for inventory use. We identified $47.5 million to $58.7 million of excess inventory that AMCOM could use to satisfy CCAD contract requirements. AMCOM, as directed by AMC, added a material cost reduction clause into the contract, which was not effective in reducing CCAD repair costs. The clause was designed for Sikorsky and CCAD to share savings associated with reduced material usage for repair programs. However, AMCOM did not use reliable data, did not consider depot labor, and omitted repair programs that experienced material cost increases in its calculation of material cost reduction. Consequently, AMCOM made an unjustified incentive payment of $11.8 million to Sikorsky for reducing material costs. Our calculations showed that depot costs increased by $29.3 million. AMCOM officials did not use the most cost-effective source of supply for consumable items purchased on the contract because AMCOM had not developed an effective material management strategy. Defense Logistics Agency (DLA) had sufficient inventory to satisfy annual contract requirements for 3,267 items, and the Sikorsky contract price for those items was $7.6 million, or 85.1 percent higher than the DLA price. In addition, from 2008 through 2010, Sikorsky was allowed to make excessive profit of about $930,760 by procuring items from DLA that it then sold to CCAD.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号