首页> 美国政府科技报告 >Application of the Critical Path Method Network Technique to the Integrated Logistics Support Plan of the AIM-9L Program.
【24h】

Application of the Critical Path Method Network Technique to the Integrated Logistics Support Plan of the AIM-9L Program.

机译:关键路径网络技术在aIm-9L程序综合后勤保障计划中的应用。

获取原文

摘要

The purpose of this report is to show how the logistics managers of the AIM-9L program initiated and used a Critical Path Method network to monitor and control the scheduling aspects of their program. The report begins by showing the environment in which the logistics managers were operating and the rationale for the employment of a networking technique. The selection process for the particular networking technique and computer program is shown in detail with emphasis on the selection criteria employed. The construction of the network through the use of a Precedence Diagram is then delineated. The use of the network is shown through the analysis of the output reports. This is intended to provide an example of how a network was successfully initiated and used in the AIM-9L logistics program. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号