首页> 美国政府科技报告 >Cooper River Rediversion Project, Bushy Park Water Supply Tests,Hydraulic Model Investigation.
【24h】

Cooper River Rediversion Project, Bushy Park Water Supply Tests,Hydraulic Model Investigation.

机译:Cooper River Rediversion项目,Bushy park供水测试,水力模型调查。

获取原文

摘要

The Charleston Harbor model reproduced the Ashley, Cooper, and Wando Rivers, and a portion of the Atlantic Ocean. The model was of fixed-bed construction and was equipped with all the necessary appurtenances for accurate reproduction and measurement of tides, tidal currents, salinity intrusion, and other significant phenomena of the prototype. Prior studies led to the conclusion that rediversion of a major portion of the Santee River flow would result in a substantial reduction in maintenance dredging in Charleston Harbor. The amount of Santee River flow to leave diverted into Cooper River became a critical value with respect to power generation at Pinopolis, water quality in Charleston Harbor, and the prevention of saltwater intrusion into the Back River Reservoir constructed to supply freshwater for the Bushy Park industrial area and the City of Charleston. A detailed study involving various weekly schedules for release fo the 3000 cfs on conditions in the upper reaches of Cooper River and the Bushy Park Reservoir was performed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号