首页> 美国政府科技报告 >Industrialized Building Construction Time/Cost Model -First Quarter FY 76Results.
【24h】

Industrialized Building Construction Time/Cost Model -First Quarter FY 76Results.

机译:工业化建筑施工时间/成本模型 - 第一季度FY 76结果。

获取原文

摘要

The time/cost project was developed as a means of comparing the cost and delivery time of industrialized building with that of conventional building to form a basis for selecting the best type of facility construction. A new cost-estimating procedure was needed to provide cost estimates for industrialized building without reference to drawings or specifications. This report describes the results of a July 1975 survey administered to a sample of industrialized builders of housing products. The survey was designed to find those variables which could predict differences in the cost and delivery time of housing products. The statistical summaries of the three major types of housing producers (panelized, modular, mobile) are presented, along with tests for the significance of differences in physical plant, production time, and employee characteristics. A followup questionnaire was sent to respondents to clarify confusion in the 'skilled' versus 'unskilled' classification of employees. Since the survey did not contain a sufficient diversity of material types of erection time data to yield the anticipated results, this report discusses the future direction for the project. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号