首页> 美国政府科技报告 >Erection Procedure for Glued-Laminated Timber Bridge Decks with Dowel Connectors.
【24h】

Erection Procedure for Glued-Laminated Timber Bridge Decks with Dowel Connectors.

机译:采用定位连接器的胶合层压木材桥面板的安装程序。

获取原文

摘要

Timber bridges are widely used in rural areas and on Forest Service roads. They are durable, economically attractive, and can be erected with a minimum of skilled labor and equipment. The newly developed glued-laminated bridge deck provides excellent structural performance, and promises to extend the service life of the bridge by protecting the superstructure. Unfortunately, few crews have had experience in erecting bridges with this system, and often common mistakes are made that can cause difficulties. Through the experience gained on eight different bridge jobs, an efficient, workable erection procedure has been developed. The erection sequence and procedures are presented in this Research Paper, and suggestions made to avoid common pitfalls. These guidelines should help an erection crew build a timber bridge with minimal difficulty. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号