首页> 美国政府科技报告 >Mississippi River: Study of Alternatives for Rehabilitation of Lock and Dam Number 1. Minneapolis, Minnesota. Supporting Data for Appendix A. Alternative Plans of Rehabilitation.
【24h】

Mississippi River: Study of Alternatives for Rehabilitation of Lock and Dam Number 1. Minneapolis, Minnesota. Supporting Data for Appendix A. Alternative Plans of Rehabilitation.

机译:密西西比河:锁定和水坝修复的替代方案研究1.明尼苏达州明尼阿波利斯。支持附录a的数据。替代康复计划。

获取原文

摘要

Contents for Computations and Notes Covering Civil Works Costs, Construction Scheduling, and Manpower: Excavation and Embankments; Steel sheet piling; Shelter for Winter Work; Removal of Concrete; Slurry Trench; Landscaping; Concrete; Sand Fill in Main Dam; Rock Anchors; Shear Keys; Vents; Discharge Manifolds with Stilling Basin East of River Wall-Plan No.4A; Discharge Manifolds with Bent Discharge Structure East of River Wall-Plan No.4B; Reconstruction of Extension of River Wall; Repair of Concrete Surfaces; Scheduling and Manpower.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号