首页> 美国政府科技报告 >European Microwave Outages (Blackout of German Scope Comm Links,October thru February 76).
【24h】

European Microwave Outages (Blackout of German Scope Comm Links,October thru February 76).

机译:欧洲微波停电(德国范围通信链接停电,10月至2月76日)。

获取原文

摘要

The operation and maintenance functions for the Defense Communications System (DCS) are performed by the military departments. The Air Force Communications Service (AFCS) is responsible for the engineering, installation, operations, and maintenance for approximately sixty percent of the wideband (line-of-signt and tropospheric scatter) systems within the DCS. During the period between October 1975 and February 1976, several links of the DCS wideband line-of-sight (LOS) system in Central Germany experienced at least one propagation outage. During this time, the Air Force links in the system suffered outage time ranging from 22 minutes to 42 hours. These propagation outages were attributed to temperature inversions. This report will outline the characteristics of the links that failed, state the difficulties involved with making decisions based on existing data and give AFCS's initial evaluation and potential solutions to the problem. This report will also outline the need for a more in-depth study of the problem. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号