首页> 美国政府科技报告 >A Methodology to Evaluate Military Systems in Naval Inventory for Installation on Existing Coast Guard Cutters.
【24h】

A Methodology to Evaluate Military Systems in Naval Inventory for Installation on Existing Coast Guard Cutters.

机译:现有海岸警卫队刀具安装海军库存军事系统评估方法。

获取原文

摘要

A modified cost-benefit model is developed to evaluate alternative military equipments for installation aboard existing Coast Guard vessels. Life-cycle costs of alternative systems are used to estimate alternative systems cost. Identified are the relevant cost elements to the Coast Guard that should be included in the life-cycle cost equation. Benefits are measured in terms of the alternative's impact on assigned peacetime missions of the vessel. To arrive at an estimate of an alternative's worth over all missions a multi-attribute technique is used. Assumptions and problems associated with using multi-attribute selection criteria are discussed. The proposed model is developed for the case where the additive function criterion is deemed appropriate. A constant-sum method is developed to use subjective judgement of experts to arrive at ratio scale benefits values for the alternatives. However, the actual implementation of the model is contingent on NOSC's factor analysis of attributes currently under development. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号