首页> 美国政府科技报告 >An Interactive Heuristic Approach for Scheduling a Multi Resource Constrained System.
【24h】

An Interactive Heuristic Approach for Scheduling a Multi Resource Constrained System.

机译:一种多资源约束系统调度的交互式启发式方法。

获取原文

摘要

The solution to a multi resource, multi project scheduling problem is approached in a way that combines human interaction, heuristics and optimality seeking procedures. A tree search algorithm is employed to perform the search. By use of heuristics, the tree can be 'pruned' so as to limit its branches, i.e., the problem is simplified and computational times for optimality seeking procedures can be drastically reduced. By man-computer interaction, data and constraints can be changed and the search through the tree controlled. The model developed has been implemented using a minicomputer and a video display. To help the operator control the scheduling procedure different graphical displays are available. The system is characterized by being flexible to changes in data and constraints, and to allow the operator to direct the computer in the search for a solution to the scheduling problem. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号