首页> 美国政府科技报告 >Earthwork Construction in Support of a Marine Amphibious Force - A Case Study.
【24h】

Earthwork Construction in Support of a Marine Amphibious Force - A Case Study.

机译:支持海上两栖部队的土方工程建设 - 个案研究。

获取原文

摘要

A Marine Amphibious Force (MAF) level Marine Air/Ground Task Force (MAGTF) will generate multiple, large-scale horizontal construction projects totaling thousands of cubic yards of earthwork. Even with Naval Construction Force (NCF) support, a landing force commander may be confronted with simultaneous critical earthwork requirements that would exceed the engineering capability of the MAF. A hypothetical earthwork construction case is defined by a set of limiting assumptions. Within the boundaries set by these assumptions, facility construction activity estimates are calculated and narrow networks are drafted. The Critical Path Method (CPM) is utilized to predict project earliest finish dates and resource allocation. The presented data (networks, resource requirements, project durations, etc.) will be of use to researchers and planners in the area of amphibious logistic support. Specific Initial Operating Capability dates for facilities will vary with operational requirements; thus, a general discussion of the projection was substituted in lieu of specific conclusions of whether facility construction was in pace with tactical and operational requirements. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号