Historical Escalation of Operation and Maintenance Costs for Field Generator Sets.

机译:现场发电机组运行维护成本的历史升级。

获取原文

摘要

This report updates the costs developed for Operating and Maintaining Generator Sets established by the Cost Estimating Relationships (CER's) in TROSCOM Technical Report 74-12. The methodology employed is based on ratio and proportion analysis, wherein each individual component of Operating and Maintenance (O and M) Cost is updated using a specialized index. Then, the cost components are reaggregated into a revised O and M Cost, which more accurately reflects the actual cost than would escalation by a single gross factor. The report covers full load and half load operating costs for most common 60 HZ and 400 HZ Gasoline Engine Driven (GED) Generator Sets, and also those for common 60 HZ Diesel Engine Driven (DED) Generator Sets. The escalation factor for 400 HZ DED Generator Sets is assumed to be the same as that for corresponding 60 HZ DED Generator Sets, using the previous TROSCOM Tech Report 74-12. The complete statement of methodology is included which allows the analysis to be adapted by the user to fit the specific time period desired. The Generator Sets referenced in this Tech Report are used to support various types of equipment, which means that the cost escalation factors provided should be of value in determining O and M Cost for generators used in a variety of applications. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号