首页> 美国政府科技报告 >Missouri River Bank Stabilization and Navigation Project. Final Environmental Statement Continuing Construction and Maintenance
【24h】

Missouri River Bank Stabilization and Navigation Project. Final Environmental Statement Continuing Construction and Maintenance

机译:密苏里河岸稳定与航海项目。最终的环境声明继续建设和维护

获取原文

摘要

The remaining new construction consists of building a few more structures, mainly in the lower 250 miles of the river, which will complete development of the bank stabilization and navigation project. Maintenance work, which will continue throughout the life of the project, will consist of repair of structures and the addition of occasional new structures to replace construction materials removed by water action and other causes, and to adjust to changing river conditions, respectively. Structure maintenance will be supplemented by occasional dredging to assist in retention of the river channel's full navigational dimensions. Construction of approved river recreational access sites will continue to occur after bank stabilization and navigation development is complete. Individual sites will be built whenever non-Federal sponsors furnish necessary lands to accommodate the development and agree to execute a cost sharing contract for developement and for operation and maintenance of the development. The scope of this EIS is limited to the identification and discussion of impacts of the remaining work, including maintenance, and their effects on the environment of the project area. The statement does not address the impacts and effects of all the work of bank stabilization and navigation that has taken place over the past 60 years.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号