首页> 美国政府科技报告 >National Dam Safety Program. Riss Lake Dam (MO 20128), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report
【24h】

National Dam Safety Program. Riss Lake Dam (MO 20128), Missouri - Kansas City Basin, Jackson County, Missouri. Phase I Inspection Report

机译:国家大坝安全计划。 Riss Lake Dam(mO 20128),密苏里州 - 堪萨斯城盆地,杰克逊县,密苏里。第一阶段检查报告

获取原文

摘要

Riss Lake Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life property. Our inspection and evaluation indicates that the spillway does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will not pass a 100-year flood (flood having a one percent chance of being exceeded in any year). The spillway will pass 12% of the Probable Maximum Flood without overtopping the dam. The Probable Maximum Flood (PMF) is defined as the flood that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号