首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Ware Industries Main (Upper) Dam (MA 00594), Connecticut River Basin, Ware, Massachusetts. Phase 1 Inspection Report.
【24h】

National Program for Inspection of Non-Federal Dams. Ware Industries Main (Upper) Dam (MA 00594), Connecticut River Basin, Ware, Massachusetts. Phase 1 Inspection Report.

机译:国家非联邦大坝检查计划。 Ware Industries main(Upper)Dam(ma 00594),康涅狄格河流域,Ware,马萨诸塞州。第1阶段检验报告。

获取原文

摘要

The Ware Industries Man (Upper) Dam consists of a main spillway 115 ft. long and approximately 34 ft. high, a spillway extension 50 ft. long and 4 ft. high, a concrete emergency spillway, a gate house with control works to a canal, and a 115 ft. long overflow weir from the canal. Based on a visual examination of the structure, the project is in good to fair condition. There was no evidence of structural failure or other conditions which would warrant urgent remedial action. The PMF outflow of 109,200 cfs would overtop the dam by 11.25 ft. With the water level at the top of dam, the spillway system can pass 7980 cfs which is 7.3 percent of the test flood.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号