首页> 美国政府科技报告 >National Dam Inspection Program. Hollidaysburg Reservoir (NDI 522), Susquehanna River Basin, Blair Run, Blair County, Pennsylvania. Phase I Inspection Report.
【24h】

National Dam Inspection Program. Hollidaysburg Reservoir (NDI 522), Susquehanna River Basin, Blair Run, Blair County, Pennsylvania. Phase I Inspection Report.

机译:国家大坝检查计划。 Hollidaysburg水库(NDI 522),susquehanna河流域,Blair Run,布莱尔县,宾夕法尼亚。第一阶段检查报告。

获取原文

摘要

The inspection was performed pursuant to the authority granted by The National Dam Inspection Act, Public Law 92-367, to the Secretary of the Army, through the Corps of Engineers, to conduct inspections of dams throughout the United States. The purpose of this inspection is to determine if the dam constitutes a hazard to human life or property.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号